Horizontal cabling runs from floor distribution cabinets to end-user outlets, while vertical fiber-optic cabling is installed for the building and campus backbone. The routes run in trays separated from high-voltage power lines.
Cabinets are organized with patch panels and cable management accessories. Each port is labeled and documented, which speeds up troubleshooting during operation.
All copper and fiber links are measured on-site, and results are reported on a link-by-link basis. The handover documentation is provided along with as-built drawings and port lists.
Request a site survey and quote for your project: info@7e.com.tr · 0216 244 2665
info@7e.com.tr · 0216 244 2665